Industrial Park snapshot (Kharagpur Induatrial Park)
District | Paschim Medinapur |
Gram panchayat | Kolaikunda Panchayat |
Total Area of Land | 257 acres |
Allottable area | 215.55 acres |
Area Available for allotment | 1.1632 acre |
No. of industrial units | 26 |
Major Industrial Sectors | Iron and steel, telecom, engineering and food processing |
Lease Premium(Rates in Rupees per acre) | Rs. 46,92,000.00 |
Connectivity
Road connectivity:
Kharagpur is well connected with major cities in West Bengal by road. NH-6 is passing through this town connecting to Kolkata and Howrah.
Railway connectivity:
Kharagpur Industrial Park is 8 Km away from Kharagpur railway station, the busiest station of south eastern railway zone. Kharagpur is an important station on Howrah-Mumbai and Howrah-Chennai route. It is 106 Km away from Howrah Junction Station.
Port connectivity:
The Haldia Port is the closest port from the Industrial Park at a distance of about 127 Km while the Kolkata port is located approximately 138 Km from the site.
Airport connectivity:
The nearest airport is the Kolkata Airport, located at a distance of 148 KM from Kharagpur.
Physical features
The Industrial Park is providing lease holding to various industrial units and institutions for setting up their plants with Building Plan approved by the WBIIDC itself.It is divided into two sectors viz. Sector A and Sector B.
Infrastructure Availability
At a glance: | |
Heads | Characteristics |
Internal Roads |
|
Street lights |
|
Water supply system |
|
Surface drainage system |
|
Power |
|
Administrative Office of WBIIDC |
|
Roads and internal transportation
Paved Bituminous internal roads are providing facilities of entry and exit to all Industrial units within the Industrial Park
Kharagpur Industrial Park
There are two approach roads as access routes for industrial units in the Industrial Park.
Approach 1 - This four lane National Highway with paved shoulder is being maintained by the National Highway Authority of India and connects Kharagpur to Kolkata
Approach 2 - All the internal routes of the Industrial Park and is being maintained by WBIIDC.
Power
West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) is providing stable and quality power supply to the units of Kharagpur Industrial Park. Adequate power is available in the area.
Water
WBIIDC has made requisite arrangements to ensure continuous water supply to the Industrial Park by pumping out ground water from eight number bore wells.
Street Light
Street light system is in existence at internal roads of the Industrial Park. WBIIDC has also taken initiatives for solar powered LED street light installation towards utilization of renewable energy and reduction of carbon footprint.
Drainage and Sewerage
Drainage of treated industrial and storm sewer is facilitated through network of surface drains
Industrial Units
There are 28 industrial units in Kharagpur Industrial Park. Some of the prominent industrial units are:
The Tata Iron & Steel Company Limited - Bearing Manufacturing Division
Flender Ltd. producing Industrial Gears
Century Extrusions Ltd. producing Structural Aluminum Sections
Japfa Comfed India Ltd., producing Poltry & cattled feed.
Key Industrial Performance Parameter :
No. of industrial units | 28 |
Total employment | 2118 persons |
Investment (In INR crores) | 632 | Units employing more than 100 people | 7 |
Units with investment more than INR 10 crores | 9 |
Types of units | Manufacturing, Bearing, Metal and related industries, Agro processing units, Chemicals and gases |
Raw Material procurement and consumption Centre
Since there are mixed industries in this Industrial Park, the raw material procurement as well as consumption Centres are of varied locations. However, based on responses from available industrial units, their raw material procurement as well as consumption regions are generally at less than 300kms. Rail, Road and Sea routes are used by units in the Industrial Park for transporting their cargo.
Common Facilitation Centre |
|
Details of Infrastructure may also be seen in GIS system | GIS System |
Digital Survey Details | login |
PRE-APPROVED CLEARANCES
Sl | Clearances/ NOCs/ Approvals |
---|---|
1. | Change of Land Use (Category of Land is ‘Industrial’, so application for conversion of land use to Industrial category is not needed to be applied for by the unit holders) |
2. | Water Connection (available in the Industrial Park) |
3. | Sewerage Connection (available in the Industrial Park) |
Approvals Required for Starting a Manufacturing Enterprise in the Industrial Park
Pre - Establishment Approvals | |||||||
---|---|---|---|---|---|---|---|
Sl | Clearances/ NOCs/Approvals | From | Web-site (Link) | ||||
1 | Registration of Property (post execution Deed) | Dte. of Registration & Stamp Revenue, Finance Dept. | Link | ||||
2 | Mutation of Land | L&LR Dept./ ULBs | Link | ||||
3 | Online Sanction of Building Plan | WBIIDC | Link | ||||
4 | Issuance of Issuance of Plinth Level Completion | WBIIDC | Link | ||||
5 | Fire Safety Recommendation | Fire & Emergency Services Dept. | Link | ||||
6 | Allocation/Permission for Surface Water (where Surface Water is the Source) | Irrigation & Waterways Dept. | Link | ||||
7 | Tree Feeling & Tree Transit Permission | Forest Dept. | Link | ||||
8 | Approval of Factory Plan under the Factories Act, 1948 | Directorate Of Factories - Department of Labour |
Link | ||||
9 | Temporary Electricity Connection | WBSEDC Ltd/ CESC, as applicable | Link | ||||
10 | Permission for extraction of ground water (where ground water is the Source) | State Water Investigation Directorate, WRI&D Dept | Link | ||||
11 | Drug License** Note - "as per use" | Health & Family Welfare Dept | Link | ||||
12 | SSI registration (as applicable) - optional | MSME & Textiles Dept. | Link | ||||
Pre - Operation Approvals | |||||||
1 | Building Occupancy Certificate | WBIIDC | Link | ||||
2 | NOC (Fire Safety Certificate) | Fire & Emergency Services Dept. | Link | ||||
3 | Fire License | Fire & Emergency Services Dept. | Link | ||||
4 | Consent to Operate under | Water and Air Act WBPCB, Environment Dept. | Link | ||||
5 | Electricity Connection | WBSEDC Ltd/ CESC, as applicable | Link | ||||
6 | Factory License under Factories Act 1948 | Directorate Of Factories, - Department Of Labour |
Link | ||||
7 | Profession Tax Registration | Directorate of Commercial Taxes, Finance Dept. | Link | ||||
8 | GST Registration | Directorate of Commercial Taxes, Finance Dept. | Link | ||||
9 | Registration under The Shops and Establishment Act (within 30 days of commencement of commercial production) | Labour Commissionerate, Labour Dept. | Link | ||||
10 | Registration under Boiler Act, 1923* Note - "as per use" | Labour Commissionerate, Labour Dept. | Link | ||||
11 | Registration for license for contractors under provision of The Contracts Labour (Regulation and Abolition) Act, 1970* * Note - "as per use" | Labour Commissionerate, Labour Dept. | Link | ||||
12 | Registration of principal employer's establishment under provision of The Contracts Labour (Regulation and Abolition) Act, 1970* * Note - "as per use" | Labour Commissionerate, Labour Dept. | Link | ||||
13 | Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996* * Note - "as per use" | Labour Commissionerate, Labour Dept. | Link | ||||
14 | Registration of establishment under the Inter State Migrant Workmen (RE&CS) Act, 1979* * Note - "as per use" | Labour Commissionerate, Labour Dept. | Link | ||||
15 | Approval for DG set installation* * Note - "as per use" | Directorate of Commercial Taxes, Electricity Duty, Finance Dept. | Link | ||||
16 | Different e-services of UDMA | Department of Urban Development & Municipal Affairs | Link |